• Level 3 or higher can create and edit Scaffold Hand-Over Certificates.
• Select the Site / Location and complete the hand-over details.
• Both the Authorised Person/Client and Scaffolding Representative must sign before Save.
• Save locks both saved signatures. Files / photos, Draft PDF and Approve require internet.
• Approved certificates are locked. The Draft or final PDF can be emailed from this form.
• Status light: green = online, red = offline. Save works offline when Offline Field Use is enabled.
Hand-Over Details
Scaffold hand-over statement
The scaffold hand-over certificate releases the scaffold(s) to the client. The scaffold(s) have been inspected by the client and has been erected to the client’s requirements. All scaffolds have been erected as per the requirements of the Good Practice Guidelines for Scaffolding in New Zealand. The client undertakes to control the use, and users of the scaffold structure(s) while under their control as required by the Health and Safety at Work Act 2015 (HSWA), and the Health and Safety in Employment Regulations 1995 (HSE Regulations).
Files & Photos
Scaffold Details
Duty Rating
Light duty
225 kg per bay
Medium duty
450 kg per bay
Heavy duty
675 kg per bay
Special duty
Note: Scaffolding over 5.0 m high is notifiable work and the erection/dismantling or alterations including the movement of planks, can only be carried out under the supervision of a Scaffolder holding a current Certificate of Competency.